Cohesive Shipping Pte Ltd
CLIENT
|
YEAR
|
PROJECT VALUE
|
NAME OF PROJECT
|
SCOPE OF WORK
|
DYNO ENGINEERING PTE LTD |
2015
|
SGD$3.8 MILLION
|
TURNOUT GRINDING VEHICLES FOR SMRT
|
LOCAL CLEARANCE, DELIVERY AND OFFLOADING OF TOGV |
SINGAPORE MASS RAPID TRANSIT, SMRT |
2014
|
ROLLING STOCK
|
02 UNITS FLAT & WELL WAGON FOR SMRT
|
SHIFTING OF 02 UNITS OF FLAT & WELL WAGON, 20 TON EACH |
JEBSEN & JESSEN
|
2014
|
EU 7.15 MILLION
|
MULTI-FUNCTION VEHICLE FOR SMRT
|
LOCAL CLEARANCE & DELIVERY, 52 TON |
BUMI ARMADA BHD |
2012 - 2013
|
US$400 MILLION
|
FPSO ARMADA CLAIRE
|
GLOBAL LOGISTICS FORWARDING, WAREHOUSING, STORAGE |
SAPURA ACERGY |
2013
|
US$800 MILLION
|
STRESS JOINTS FOR GUMUSUT PROJECT
|
GLOBAL LOGISTICS AND FORWARDING FROM US TO LABUAN. LENGTH 24 MTRS EA |
BUMI ARMADA BHD |
2011 - 2012
|
US$400 MILLION
|
FPSO ARMADA D1
|
GLOBAL LOGISTICS FORWARDING, WAREHOUSING, STORAGE |
BUMI ARMADA BHD |
2010 - 2011 |
US$400 MILLION
|
FPSO ARMADA TGT
|
GLOBAL LOGISTICS, FORWARDING, WAREHOUSING, STORAGE
|
SAPURA ACERGY |
2010
|
US$200 MILLION
|
CONCRETE MATTRESSES FOR PIPE LAYING FOR SABAH SHELL
|
CHARTER VESSEL AND LOADING ARRANGEMENT AT BATAM TO LABUAN |
Cohesive Trade
CLIENT
|
YEAR
|
PROJECT VALUE
|
SCOPE OF WORK
|
CHONGQING BAO STEEL |
2012 - CURRENT
|
US$20 MILLION
|
TRADING AGENCY, LOGISTICS
|
CETC |
2012 - CURRENT
|
US$30 MILLION
|
TRADING AGENCY, LOGISTICS
|
CHONGQING LEPHONE TECHNOLOGY |
2012 - CURRENT
|
US$80 MILLION
|
TRADING AGENCY, LOGISTICS
|
CHONGQING MIDEA AIR-CONDITIONING EQUIPMENT |
2012 - CURRENT
|
US$10 MILLION
|
TRADING AGENCY, LOGISTICS
|
Cohesive Supply Chain Management
CLIENT
|
YEAR | SCOPE OF WORK |
AERISON |
2012 - CURRENT
|
PROCUREMENT, MANUFACTURING, DOCUMENTATION, LOGISTICS, SUPPLY CHAIN MANAGEMENT
|
TAIJI GROUP |
2012 - CURRENT
|
TRADING
|
Cohesive Environmental Solutions
CLIENT | PROJECT | SCOPE OF WORK | LOCATION |
EPSA-CHEVRON |
GORGON PROJECT
|
PACKAGING 3 OFF CAT DIESEL GENERATORS FOR THE ESSENTIAL POWER ON BARROW ISLAND. NOISE LEVELS TO BE <85DB(A) AT 1 METER. SCOPE OF WORK INCLUDED 24 HOURS INTEGRAL BASE FUEL TANKS, FORCED VENTILATION SYSTEMS AND ENGINE EXHAUST MUFFLER.
|
BARROW ISLAND, WESTERN AUSTRALIA
|
MTUDDA |
HEWLETT PACKARD DATA CENTRE
|
PACKAGING 5 OFF MTUDDA 20V400 G23 DIESEL GENERATOR INSIDE A CUSTOM ENGINEERED 40 FT CONTAINER TO ACHIEVE <82DB(A) AT 1 METER FOR STANDBY POWER. SCOPE OF WORKS INCLUDED A 20,000 L DIESEL FUEL TANK CONFIGURED UNDERNEATH THE GENERATOR PACKAGE.
|
SYDNEY, NSW
|
NAP SILENTFLO |
NAP SILENTLO
|
REACHED 65DB(A) AT 1 METER ON COMMISSION.
CES-H 600
|
MOUNT TERRY SUBSTATION
|
QGC |
QCLNG (CPP/FCS) PROJECT
|
MANAGED TO DELIVER ALL 20,000 M2 WORHT OF PANELS AHEAD OF THE PROPOSED SCHEDULE. ALL PANELS ARE ATTACHED TOGETHER TO FORM BOTH CPP (CENTRAL PROCESSING PLANT) AND FCS (FIELD COMPRESSION STATION).
|
QUEENSLAND, AUSTRALIA
|